As a hospital information network cabling infrastructure construction, standardization and quality construction maintenance must be highly valued.At work I assume the specific hospital information cabling work, the following conclusions:
One. Have a solid theoretical basis for guiding
Often said, "Teachers open the door, cultivation is" exposed wiring at the beginning of work, is the director of our unit accountable department maintenance tasks, with only a specific frame diagram and the general situation of the introduction.Follow-up work in the familiar process, I gradually purchased from the Bookstore cabling expertise library and study, the first to add related theoretically to their knowledge, so that the actual work, with the company side and the construction team of project managersexchanges between the theory with reality can be more just and objective, can not be the corporate sector and the construction team that is the object of paralysis.
II. To have the ability to distinguish right from wrong
Specific projects in the construction process, Party A and B often have different views and determine the standard construction specifications.At this time we need to have the ability to distinguish right from wrong, and sometimes can help supervision expertise.However, the company side and the construction team is not entirely implausible, listen to their feedback, advice and more advice to the peer is able to avoid mistakes and to continuously improve the shortcut.Of course, in listening to opinions, we can not completely collects must listen to and compare multiple make objective and impartial judgments.
III. Must continue to learn the ability to observe and summarize
Need for new technologies, new materials and new programs to keep keen observation and preparation of appropriate and timely use of advanced cost-effective solution suitable.Network cabling technology, materials and new program updates made rapid progress, we need to get grip of the mainstream technology and materials technology, reasonable choice of the mainstream of scientific technology and materials solutions, to avoid the blind pursuit of new technologies and new materials or using new programs willapplication out and unable to adapt to upgrade old technology, old materials and old programs.
IV. To have hands-on action
Wiring in the specific process of project implementation must be active and responsible Party to assume the role of project manager, the need to strengthen on-site review and oversight to avoid construction of non-standard or does not meet the requirements or rework to happen.Otherwise, wait until the time of acceptance to go find these problems, ranging from needs rework, it caused heavy schedule delays, the progress of information technology projects, and even cause irreparable defect.Especially when non-standard project management and construction team, when frequently changing personnel, but also to remind the project manager of B, always supervise their construction specifications.
Five. Be patient and meticulous records of sustained
In the routine maintenance work, must act in accordance with standard work procedures, but also to persevere in strict accordance with the process every step of the down-do place.Cabling from the design, construction, inspection to the routine maintenance, the stage must have a variety of drawings and detailed records.In the actual work, I found that particular attention be ignored and not a routine maintenance records.Add and Delete Information in particular point records must be promptly and accurately, to truly reflected in the drawings in order to avoid future maintenance problems.
VI. Have a high sense of responsibility and the serious and responsible attitude
Attitude is everything, as long as due diligence, do not be afraid to miss work, I believe that every mistake is a valuable asset and experience, will work on future projects, and other reference.Only the work of each report seriously and in a highly responsible attitude in order to get the job done.